TECHNICAL DATA

Appearance: Powder

Packaging: 15kg paper bag in 1080kg pallets

Color: White

Grain: ≤ <0.1mm

Dry mass volume: 1300 kg / m3

Volume of wet mortar: 1600 kg / m3

Storage: Store in a dry place on wooden pallets, 12 months from date of production

Mixing water: 5-5.5 liters / sack

Application temperatures: From 5 ° C to 35 ° C

Application thickness: 3 mm / hand

Method of application: 2 hands

Consumption: 1.3 -1.5 kg / m2 / mm

Application layers: Two hands

Second hand wait time:> 2 hours

Compression resistance (28 days):> ≥ 1.6N / mm2

Tensile strength (28 days):> ≥ 0.8 N / mm2

Water Absorption: ≥ Category WO

Aviability (µ):> 5/20

Thermal conductivity (λ10, dry):> 0.35

Fire Reaction: ≥ Class A1

Gray cement based quartz powder, ready to use. For outdoor and indoor environments. Classified according to the standard CT40 F6 EN 13813. Easy to operate, fast and economical, exhibits good workmanship and high surface density, high mechanical resistance to abrasion and permeability.

 

APPLICATION AREA

 

For industrial floors (concrete), for silos, ochens, warehouses, garages, ramps, etc. For exterior and interior as well as high-rise buildings.

 

PREPARATION OF THE GROUND

 

Check that the concrete floor is still moist, uniform and well leveled.

POWDER APPLICATION: On fresh concrete, prior to drying. Spread quartz powder evenly over the concrete surface with about 3-5 kg ​​/ m2 in one or more layers. Once the quartz has absorbed moisture from the concrete surface, level it properly by helicopter.

 

PASTE APPLICATION: Mix a 25 kg TOPFLOOR bag with about 3.5-4 liters of water, manually or with a low turnover electric mixer until you achieve a homogeneous, plastic paste. The product is applied directly to wet concrete with a thickness of 6-10 mm.

 

BE CAREFUL! Make joints in spaces about 4m and moisten the surface for the first 7 days.